Indian arm of Vexcolt UK · manufacturing in India since 2012info@vexcoltindia.com · +91 95992 91005
Project

TCS Campus Noida

Tata Consultancy Services · Noida, Uttar Pradesh · Ongoing

Commercial & IT · Seismic Zone IV

A large-floor-plate IT campus in Zone IV — the combination that generates the most joint metres per square metre of any building type we work on, in the market with the widest thermal swing in the country.

ClientTata Consultancy Services
LocationNoida, Uttar Pradesh — Seismic Zone IV under IS 1893
SectorCommercial & IT
StatusOngoing
Gap range50, 100, 150 and 200 mm
ScopeDesign of the joint schedule, manufacture in India, and installation by our own crews

Send drawings for a joint schedule

Systems supplied

How we knowPriced against a full joint schedule held in the project folder; dispatched from Delhi in June and August 2026. Gaps and systems are taken from the production and dispatch records for this job, not from a catalogue.

What this building needed

Five systems on one job, and that is the point

The schedule runs MegAtec 300, 310, 340, 360 and 610 across gaps from 50 to 200 mm. A campus block does not have one joint condition; it has floor-to-floor in the office plates, floor-to-wall at every core, wall-to-wall through the atrium, and wider separations where blocks meet. Specifying a single product across all of that is how a corner detail ends up improvised on site.

Noida is Zone IV and the thermal swing is the widest in India

NCR runs from about 4 °C to 45 °C and beyond. An identical bay accumulates more than twice the thermal movement here than it would in Chennai, and where two blocks are structurally separated the seismic case under IS 1893 has to be checked before the joint is sized.

Manufactured in the same city it is installed in

Our factory is in Azadpur. On a Noida job a gap found wider on site than the drawing said is a recut measured in days, not the four to six weeks an extrusion order takes.

Related: expansion joints for commercial it · our work in Delhi NCR · how the gap width is calculated · what the seismic zone changes.

Related projects

All 76 projects →

Raheja Vivarea
K Raheja Corp · Bengaluru
Sumadhura Epitome
Sumadhura Group · Bengaluru
Eldeco Live By The Greens
Eldeco Group · Noida
T P Solar Plant, Tirunelveli
Tata Power Solar · Tirunelveli

Building something similar?

Send GFC or concept drawings and we will return a location-by-location joint schedule, with the gap, the system and the movement class named.

Talk to our technical team