T P Solar Plant, Tirunelveli

Tata Power Solar · Tirunelveli, Tamil Nadu · Completed

Industrial · Seismic Zone II

A manufacturing plant, which is a different brief from an office building sharing the same floor area.

ClientTata Power Solar
LocationTirunelveli, Tamil Nadu — Seismic Zone II under IS 1893
SectorIndustrial
StatusCompleted
Gap range50 mm
ScopeDesign of the joint schedule, manufacture in India, and installation by our own crews

Send drawings for a joint schedule

Systems supplied

How we knowFour dispatches between July and October, on dated packing sheets. Gaps and systems are taken from the production and dispatch records for this job, not from a catalogue.

What this building needed

An industrial floor is a load problem before it is a movement problem

Manufacturing floors take wheeled and point loads that office joints are not rated for, and they are washed down. MegAtec 340 was chosen for its self-centring action and its load rating, not for its movement range — the 50 mm gap is undemanding by comparison.

Self-centring matters where the traffic is repetitive

A joint crossed hundreds of times a day by the same wheels in the same place will drift out of position unless it returns itself. The centring bar in the 340 is what stops that becoming a rattle and then a fixing failure.

Tirunelveli is Zone II with a narrow thermal swing

Neither the seismic nor the thermal case governs. That is the point: on this building the joint was selected against traffic and cleanability, and specifying it against movement would have produced the wrong product.

Related: expansion joints for commercial it · how the gap width is calculated.

Related projects

All 76 projects →

TCS Campus Noida
Tata Consultancy Services · Noida
Raheja Vivarea
K Raheja Corp · Bengaluru
Sumadhura Epitome
Sumadhura Group · Bengaluru
Eldeco Live By The Greens
Eldeco Group · Noida

Building something similar?

Send GFC or concept drawings and we will return a location-by-location joint schedule, with the gap, the system and the movement class named.

Talk to our technical team