How the work actually gets done
Challenge, approach and result on five representative projects — townships, IT parks, government healthcare and coastal residential.

Five projects, in depth

Bhartiya City — Nikoo Homes & Mall of Bengaluru
ChallengeA 100+ acre integrated township — high-rise residential phases, SEZ office blocks, the Mall of Bengaluru and The Leela hotel precinct — needing floor and wall movement joints across podiums, towers and public areas, phased over years.
What we didDesigned, supplied and installed MegAtec metal floor and wall systems (MegAtec 300/310/360 with aluminium cover plates in the mall and SEZ blocks) across multiple phases, coordinating with successive contractors (Pratibha, BCD, UPPL, Urbanac, Keystone) as a single accountable partner.
ResultEight separate engagements across the estate between 2016 and 2021 — our longest-running client relationship, and proof the design-supply-install model survives contractor changes.

Embassy Splendid TechZone, Chennai
ChallengeLarge-floorplate office blocks where joints take constant foot and trolley traffic and must stay flush and durable in high-occupancy commercial space.
What we didSupplied and installed MegAtec 300 floor and MegAtec 360 wall systems across the park's blocks, working with main contractor BLK.
ResultDelivered across a campus that now sits in Embassy REIT's portfolio (5.0M sq ft) — institutional-grade scrutiny at acquisition, and our entry into repeat Embassy work at Lake Terrace, Block 3A and Manyata.

DLF Downtown, Chennai & Gurugram
ChallengeCampus-scale office developments — 27 acres and 6.8M sq ft at Taramani — with long floor plates, connected blocks and significant structural movement between them.
What we didDesigned, supplied and installed MegAtec 300 at Taramani, and MegAtec 310, 360 and FlexAtec 1200 at Gurugram, as a single-source partner, with the approval documentation (TDS, method statements, MTCs) DLF's PMCs require.
ResultRepeat work orders across two cities for India's largest listed developer — followed by DLF Alameda (2023).

CAPF Institute of Medical Sciences, New Delhi
ChallengeA national medical campus needs hygienic, flush, durable joints across large institutional floor areas — with fire compartmentation maintained wherever a joint crosses a compartment line.
What we didSupplied and installed MegAtec 310, 340, 360 and 610 systems across the campus under L&T, with pre-assembled compliance documentation for a government-grade approval chain.
ResultMultiple work orders on one of the Govt of India's flagship healthcare projects — the reference that anchors our hospital portfolio.

Tata Tritvam, Kochi
ChallengeWaterfront high-rise residential: joints must absorb structural movement while surviving a corrosive coastal environment and keeping podium and terrace levels watertight.
What we didSupplied and installed aluminium movement-joint systems with waterproofing integration detailed for the marine exposure.
ResultCompleted 2019 for Tata Realty — alongside Trillium Mall (Nagpur) and TP Solar (Tirunelveli), part of a multi-project Tata group relationship.
Facts from Vexcolt India work-order records and public developer disclosures. Full project list: all 80+ projects →
Still deciding? Send us the drawings.
We'll recommend the right system per location and return TDS + CAD details your consultant can specify directly.