Short answer

IS 456 (clause 27) calls for an expansion joint where the plan changes abruptly and says structures over 45 m normally have one, leaving the decision to the designer. IS 3414 (Table 2) recommends closer spacing: 30 m for long uniform frames and 15 m for thin unprotected roof slabs. IS 1893 sets the seismic separation between blocks, which in the higher zones usually decides the width. No code sets a performance for the cover.

“As per IS code” turns up in a lot of BOQ lines for expansion joints. It is meant as a guarantee, and it reads like one, but it points at three different documents written for three different purposes, and none of them describes the product being bought. This piece sets out what each code is for, what it asks of a building joint, and the half of the joint that has to be written into the specification because no code covers it.

Check the edition in forceClause numbers here are from IS 456:2000 and IS 3414:1968, in our own words. Read the codes themselves, and confirm against the current editions, before anything goes into a drawing or a specification. Where the joint goes and how wide it is are decisions for the structural engineer of record; a joint supplier checks a system against them and never originates them.
Which code covers which part of a building expansion joint Two blocks of a building, a low podium on the left and a taller tower on the right, separated by a full-height gap. IS 456 governs whether and where a joint is needed in the concrete frame. IS 1893 sets the width of the separation between the blocks. IS 3414 covers the design and installation of joints in buildings. The cover over the gap, with its movement class, traffic rating, membrane and fire barrier, is set by the project specification; no code specifies it. IS 456 whether and where a joint is needed IS 1893the separation width Your specification the cover: movement class, traffic, membrane, fire barrier IS 3414 the joint in the building Podium Tower
Which code covers which part of the joint. Schematic, not to scale.

The three codes, and what each is for

  • IS 456:2000, plain and reinforced concrete. The concrete design code. It decides when a frame needs to be broken by a joint.
  • IS 3414:1968, joints in buildings. The code of practice for the design and installation of joints in masonry and concrete, and the document IS 456 points to for the design considerations.
  • IS 1893 (Part 1):2016, earthquake-resistant design of buildings. It sets the seismic separation between adjacent blocks, which in the higher zones usually decides the width of the gap.
CodeWhat it decidesFigures used in this piece
IS 456:2000Whether a concrete structure needs a joint: an abrupt change in plan (clause 27.1), or length (clause 27.2)Normally over 45 m, at the designer’s discretion. Shrinkage strain 0.0003 (clause 6.2.4.1). α about 10 × 10−6 per °C, by aggregate (clause 6.2.6)
IS 3414:1968How joints are spaced, designed and installedLong uniform frames 30 m; thin unprotected roofs 15 m (Table 2). Concrete α 10–14 × 10−6 per °C (Table 1)
IS 1893 (Part 1):2016The seismic separation between adjacent blocksZone factors 0.10, 0.16, 0.24, 0.36 (Zones II–V); separation = R × the sum of the two blocks’ displacements

What IS 456 asks

IS 456 deals with expansion joints in its clause 27. It looks at two situations. The first, in clause 27.1, is a structure whose plan changes abruptly: an L, a T or a U, or a long block meeting a short one, where the parts move in different directions and the corner takes the strain. The joint there has to be a complete break, with no reinforcement crossing it, and the structures either side are preferably carried on separate columns or walls, though not necessarily on separate foundations.

The second, in clause 27.2, is length. Structures over 45 m are normally designed with one or more joints, but the clause names temperature, exposure and the season of casting as factors and leaves the provision to the designer. It points to IS 3414 for the design considerations.

The same code supplies two of the numbers that size a thermal joint. Clause 6.2.6 gives the coefficient of thermal expansion of concrete as a range that depends on the aggregate, with 10 × 10−6 per °C the value normally used, and clause 6.2.4.1 takes a total shrinkage strain of about 0.0003 for design where there is no test data. On a 45 m bay those come to about 20 mm of thermal movement in Delhi NCR and about 13 mm of shrinkage over the life of the frame.

Read 45 m as a default to be checked. An exposed deck, a car park or a roof sees a wider temperature range than a shaded internal frame and wants joints closer together; a short building with an awkward plan may need one at a corner well inside 45 m. How far apart expansion joints should be goes through the four things that override the default, and how to calculate the gap works the arithmetic.

What IS 3414 says

IS 3414 dates from 1968. BIS lists it as reaffirmed in 2020, with no amendments, so it is still the current edition. It takes the form of recommendations for joints in masonry and concrete in buildings (clause 1.1), and it leaves out heavy-duty floors and pavements, water-retaining structures and power houses (clause 1.2).

Its most useful page is Table 2, called up by clause 4.4, which gives spacing by type of element:

Element (IS 3414, Table 2)Spacing of joints
Frames: a joint through slabs, beams and columns, making two independent units30 m in long uniform structures, and at the corners of L, H, T and C shapes
RCC roof slabs protected by insulation, in unframed construction20 to 30 m, and at changes in direction
Thin unprotected roof slabs15 m
Load-bearing walls with cross walls, and warehouse-type walls without them30 m
Chajjas, balconies and parapets6 to 12 m

30 m or 45 m?

Set side by side, the two codes do not give the same number for a long frame. IS 3414 recommends 30 m, and IS 456, written later, treats 45 m as the length above which a joint is normal. Indian RCC practice mostly works to the second. Neither is a limit to read off a table: IS 456 leaves the decision to the designer, and a note under clause 4.4 of IS 3414 says spacing and width depend mainly on local experience. “As per IS code” on a BOQ does not settle which applies. The spacing on the structural drawing does.

The rest of the code, clause by clause

  • Season of casting (clause 4.2.1). Concrete cast in summer will mostly contract, and concrete cast in winter will mostly expand, so joints may go further apart in the first case, provided the tensile stress is designed for, and closer in the second.
  • Material movement (clauses 4.2.1.1 and 4.2.2.1). Table 1 gives concrete and mortar 10 to 14 × 10−6 per °C, and brickwork 5 to 7. Dense concrete shrinks 0.2 to 0.5 mm per metre on drying, which brackets the 0.0003 in IS 456.
  • Load and settlement (clause 4.3). Joints also have to allow for unequal loading between parts of a building and for differential settlement.
  • How far down the joint goes (clause 4.4.3). In a framed structure it runs from the top of the column to the top of the pedestal over the footing. The footing itself is not split.
  • Roofs (clause 6.4.1). The joint has to seal effectively against water, and a waterbar is required.
  • Floors (clause 6.4.2). A waterbar may not be necessary. Where the joint cannot be left open, a cover plate fixed on one side and free to slide on the other may be used.
  • Slab on a wall (clause 6.5). The slab must be free to move at its bearing, on a sliding joint.
  • Maintenance (clause 7.1). Reseal in dry spells of intermediate temperature, when the joint is about halfway between its summer and winter width.

A specification that cites “IS 3414” should still say, in its own words, what the joint must do. The code’s number alone does not tell a supplier the gap, the movement or the traffic.

IS 1893 and the seismic separation

IS 1893 (Part 1) divides India into four seismic zones, with zone factors of 0.10 for Zone II, 0.16 for Zone III, 0.24 for Zone IV and 0.36 for Zone V. For two adjacent blocks it sets the separation from their calculated displacements, multiplied by the response reduction factor R, so that the blocks cannot hit each other as they sway out of phase.

The multiplication is what makes the seismic gap large. For two 15-storey blocks in Zone IV, each with a calculated roof displacement of about 40 mm and R of 5, the separation is 5 × (40 + 40) = 400 mm, against about 20 mm of thermal movement for a 45 m bay in the same city. Once the seismic case applies, it sizes the gap and the thermal figure becomes a check. What the seismic zone changes works through it zone by zone.

What no code specifies: the cover

Between them, the three codes decide where the gap is and how wide it is. IS 3414 sketches typical closures, such as a metal cradle or a sliding plate, but sets no performance for them: no movement class, no traffic rating, no finish height. Six things about the cover have to be stated in the specification, because otherwise the cheapest product that fills the gap will meet “as per IS code” as well as the right one:

  1. The movement it must take, in millimetres, at each location, and that it has been cycled to prove it. ASTM E-1399 is the usual test: Class I for thermal movement, Class II for wind and Class III for seismic.
  2. The traffic over it, from people to trolleys, beds and cars. Data sheets give a rating per day for each kind of traffic.
  3. The finish height, so the joint sits flush with the floor and not proud of it or sunk below it.
  4. The membrane under floor and roof joints, and who laps it onto the waterproofing on each side.
  5. A fire barrier where the joint crosses a fire compartment line. We supply one on request, its rating confirmed per job.
  6. The fixing and the method statement: how the frame is bedded and anchored, and who installs it.

A BOQ line that meets the codes and the site

Keep the code references, then add a line per location that fills those six gaps. For a CPWD tender, the DSR items 5.44, 5.45 and 5.46 cover floor, wall and roof joints, and the DSR page shows what each item asks for and what it leaves out. For any other tender, the performance clause on each product page, and the one on expansion joint details and specification, turns the six points into requirements a substitute has to meet. For the whole subject in one place, see expansion joints in buildings.

Quick answers

What does IS 456 say about expansion joints?

Clause 27.1 calls for a joint where the plan of a structure changes abruptly. Clause 27.2 says structures over 45 m are normally designed with one or more joints, leaves the provision to the designer, and points to IS 3414 for the design considerations.

What spacing does IS 3414 recommend?

Table 2 gives 30 m for long uniform frames and for walls, 20 to 30 m for protected RCC roof slabs in unframed construction, 15 m for thin unprotected roof slabs and 6 to 12 m for chajjas, balconies and parapets. Frames also get a joint at the corners of L, H, T and C shapes.

What is the latest edition of IS 3414?

IS 3414:1968. BIS lists it as reaffirmed in 2020, with no amendments, so the 1968 text is the one in force.

Is there an IS code for expansion joints in concrete buildings?

Yes. IS 456 decides whether a concrete frame needs a joint, and IS 3414 covers how joints in buildings are spaced, designed and installed. Neither sets a performance for the cover. Its movement, traffic rating, finish height and membrane have to be written into the specification.

How wide should an expansion joint be as per the IS codes?

No code gives one width. Work out the thermal movement and the shrinkage from the IS 456 values: on a 45 m bay in Delhi NCR, about 20 mm and 13 mm. Then work out the seismic separation from IS 1893. Where the seismic case applies, it sizes the gap and the thermal figure becomes a check. How to calculate the gap works both through.

Send us the drawingsWe return a joint schedule with every joint located, its gap, its calculated movement and the system that meets it, ready to sit under the code references in the tender. Get a joint schedule, or send the BOQ for a quote.