A super-speciality hospital in Zone II — the case where seismic does not govern, and the money is better spent on the things that actually fail.

ClientGovt of Telangana, with L&T
LocationWarangal, Telangana — Seismic Zone II under IS 1893
SectorHospitals and healthcare
Gap range100 mm
ScopeDesign of the joint schedule, manufacture in India, and installation by our own crews

Get a joint scheduleSend your BOQ for a quote

Systems supplied

How we knowDispatched December 2024, then March, July and August 2026 as the programme released. Gaps and systems are taken from the production and dispatch records for this job, not from a catalogue. Section drawings are illustrations, not shop drawings.

What this building needed

Zone II means the seismic system is an over-specification

Telangana sits at the bottom of the IS 1893 scale. Outside specific tall-tower cases the seismic demand does not size the joint here, and a Class III seismic system specified by reflex is money that would do more work in the waterproofing detail and the fixing schedule.

So the governing requirement is cleanability

With the movement case straightforward, what decides the specification is that the floor is wet-mopped daily and crossed constantly by beds and trolleys. Flush, sealed, no recess the mop cannot reach, and rated for a wheeled point load rather than a distributed one.

Released in phases across two years

December 2024, then March, July and August 2026. Hospital construction hands over wing by wing, and the joint has to still be available and identical when the last wing is ready.

Related: expansion joints for healthcare · how the gap width is calculated.