Project

NIT Patna

National Institute of Technology · Patna, Bihar · MegAtec 310, 340, 360 and 610

National Institute of Technology · Patna, Bihar

Healthcare & institutional · Seismic Zone IV

An institutional campus in Zone IV delivered in phases over close to two years — the kind of job where the schedule matters more than any single detail.

ClientNational Institute of Technology
LocationPatna, Bihar — Seismic Zone IV under IS 1893
SectorHealthcare & institutional
Gap range100 and 150 mm
ScopeDesign of the joint schedule, manufacture in India, and installation by our own crews

Get a joint scheduleSend your BOQ for a quote

Systems supplied

How we knowSeven dispatches from October 2024 through July 2026, across two packing workbooks. Gaps and systems are taken from the production and dispatch records for this job, not from a catalogue. Section drawings are illustrations, not shop drawings.

What this building needed

Two years of phased delivery, not one drop

Seven separate dispatches between October 2024 and July 2026. Campus work releases building by building, and a joint supplier who ships once and disappears leaves the later blocks to whatever is available locally. Holding the same profile across a two-year programme is what keeps the last block matching the first.

Zone IV, and the gaps show it

The schedule runs at 100 and 150 mm — wider than the same building type would need in the south. Patna sits in Zone IV under IS 1893, alongside Delhi.

Institutional corridors are cleaned, not just walked on

Teaching and residential blocks are wet-mopped daily. An open gap or a raised lip collects water and becomes a maintenance complaint, which is why the floor systems here are flush and sealed rather than open-gap.

Related: expansion joints for healthcare · how the gap width is calculated · what the seismic zone changes.

Related projects

All 80+ projects →

Building something similar?

Send GFC or concept drawings and we will return a location-by-location joint schedule, with the gap, the system and the movement class named.