Project

IIT Indore

Ram Niwas Goel · Indore, Madhya Pradesh · MegAtec 340

Ram Niwas Goel · Indore, Madhya Pradesh

Healthcare & institutional · Seismic Zone III

An institute campus at Simrol, and one of the two genuinely new cities in our record this year.

ClientRam Niwas Goel
LocationIndore, Madhya Pradesh — Seismic Zone III under IS 1893
SectorHealthcare & institutional
Gap range100 mm
ScopeDesign of the joint schedule, manufacture in India, and installation by our own crews

Get a joint scheduleSend your BOQ for a quote

Systems supplied

How we knowPurchase order placed July 2026; first dispatch August 2026. Gaps and systems are taken from the production and dispatch records for this job, not from a catalogue. Section drawings are illustrations, not shop drawings.

What this building needed

A 100 mm trafficked floor joint, self-centring

MegAtec 340 at 100 mm. Academic buildings carry constant foot traffic across the same lines between blocks, and the centring action is what keeps a joint of that width sitting where it was set rather than drifting under repetitive load.

Zone III, with a wide continental swing

Madhya Pradesh sits in the moderate seismic band, but the interior of the country runs a large annual temperature range. On a campus with long low blocks the thermal calculation is what sizes the joint.

Ordered in July, shipping in August

Local manufacture is what makes that interval possible. An imported joint system on the same programme would still be in transit.

Related: expansion joints for healthcare · how the gap width is calculated · what the seismic zone changes.

Related projects

All 80+ projects →

Building something similar?

Send GFC or concept drawings and we will return a location-by-location joint schedule, with the gap, the system and the movement class named.